{"id":2738,"date":"2024-09-09T13:48:44","date_gmt":"2024-09-09T18:48:44","guid":{"rendered":"https:\/\/www.brandonu.ca\/safety\/?post_type=bu_safety_post&#038;p=2738"},"modified":"2024-10-08T15:52:16","modified_gmt":"2024-10-08T20:52:16","slug":"18th-street-paving-may-disrupt-campus-access","status":"publish","type":"bu_safety_post","link":"https:\/\/www.brandonu.ca\/safety\/safety-notice\/18th-street-paving-may-disrupt-campus-access\/","title":{"rendered":"18th Street paving"},"content":{"rendered":"<div id=\"attachment_2740\" class=\"wp-caption alignnone\" style=\"width: 2560px\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-scaled.jpeg\" alt=\"New asphalt road. Road asphalt works. Construction works\" width=\"2560\" height=\"1707\" class=\"wp-image-2740 size-full\" srcset=\"https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-scaled.jpeg 2560w, https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-300x200.jpeg 300w, https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-1024x683.jpeg 1024w, https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-768x512.jpeg 768w, https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-1536x1024.jpeg 1536w, https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-2048x1366.jpeg 2048w, https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-250x167.jpeg 250w, https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-640x427.jpeg 640w, https:\/\/www.brandonu.ca\/safety\/files\/AdobeStock_162075627-940x627.jpeg 940w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><p class=\"wp-caption-text\">New asphalt coming soon to 18th Street.<\/p><\/div>\n<p>The Province of Manitoba is <span data-markjs=\"true\">paving<\/span> 18<sup>th<\/sup> Street starting Sept. 16 (weather permitting). The project will be done in stages with each stage expecting to take 3 to 5 days. This may change due to weather, traffic congestion and unaccounted for road conditions. The stages that will impact entry, exit to the university and the front loop on 18<sup>th<\/sup> street are:<\/p>\n<ul>\n<li>Stage 1 \u2013 Rosser Avenue to Louise Avenue Southbound, on the west side of 18<sup>th<\/sup> street \u2013 starting Sept. 16, 2024<\/li>\n<li>Stage 2 \u2013 Louise Avenue to McTavish Avenue Southbound, on the west side of 18<sup>th<\/sup> street \u2013 starting after Stage 1<\/li>\n<li>Stage 5 \u2013 McTavish Avenue to Louise Avenue Northbound, on the east side of 18<sup>th<\/sup> street &#8211; starting TBD, after paving work further south<\/li>\n<li>Stage 6 &#8211; Louise Avenue to Rosser Avenue Northbound, on the east side of 18<sup>th<\/sup> Street \u2013 starting after Stage 5<\/li>\n<\/ul>\n<p>There will be times throughout this process when you will not be able to cross over 18<sup>th<\/sup> Street at various points during the milling and <span data-markjs=\"true\">paving<\/span>. Pedestrian crosswalks may be closed at times during construction.<\/p>\n<p>Work will include concrete curb repairs, milling of the existing asphalt and <span data-markjs=\"true\">paving<\/span> over the milled surface.\u00a0 This work requires the application of road oil to the road surface, and although the oil remains uncovered for a brief period, it does not mix well with children, pets, or vehicles.<\/p>\n<p>Please be mindful of the work and avoid these areas during construction.\u00a0 As alternate routes onto campus during this time, the stars on the map below indicate roads that should remain accessible.<\/p>\n<p>If you have any questions, please direct them to <a href=\"m&#97;&#105;&#x6c;&#x74;&#x6f;:&#112;&#104;&#x79;&#x73;&#x69;ca&#108;&#x5f;&#x70;&#x6c;an&#116;&#64;&#x62;&#x72;&#x61;n&#100;&#111;&#x6e;&#x75;&#x2e;c&#97;\" data-outlook-id=\"4ee21f93-9b76-4750-b015-bc8cc8af76df\">&#112;&#x68;y&#115;&#x69;&#99;&#x61;l&#95;&#x70;l&#x61;&#x6e;&#116;&#x40;b&#114;&#x61;n&#x64;&#x6f;&#110;&#x75;&#46;&#99;&#x61;<\/a>.<\/p>\n<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM.png\" alt=\"Map of campus, showing closed accesses on 18th Street, with alternate routes from the south, west, and north.\" width=\"1924\" height=\"1134\" class=\"alignnone wp-image-2739 size-full\" srcset=\"https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM.png 1924w, https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM-300x177.png 300w, https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM-1024x604.png 1024w, https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM-768x453.png 768w, https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM-1536x905.png 1536w, https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM-250x147.png 250w, https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM-640x377.png 640w, https:\/\/www.brandonu.ca\/safety\/files\/Screenshot-2024-09-06-at-2.33.24\u202fPM-940x554.png 940w\" sizes=\"auto, (max-width: 1924px) 100vw, 1924px\" \/>\n","protected":false},"excerpt":{"rendered":"<p>Extensive roadwork and repaving on 18th Street will limit campus access from and across 18th Street. Please be mindful of construction and aware that access to campus may change from day to day.<\/p>\n","protected":false},"template":"","meta":{"jetpack_post_was_ever_published":false,"jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"class_list":["post-2738","bu_safety_post","type-bu_safety_post","status-publish","hentry"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"cmb2":{"_busafe_safety_notice_meta":{"_busafe_severity":"notice","_busafe_expiry":"1729863660","_busafe_disappear":"1730122860"}},"_links":{"self":[{"href":"https:\/\/www.brandonu.ca\/safety\/wp-json\/wp\/v2\/safety-notice\/2738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.brandonu.ca\/safety\/wp-json\/wp\/v2\/safety-notice"}],"about":[{"href":"https:\/\/www.brandonu.ca\/safety\/wp-json\/wp\/v2\/types\/bu_safety_post"}],"version-history":[{"count":7,"href":"https:\/\/www.brandonu.ca\/safety\/wp-json\/wp\/v2\/safety-notice\/2738\/revisions"}],"predecessor-version":[{"id":2754,"href":"https:\/\/www.brandonu.ca\/safety\/wp-json\/wp\/v2\/safety-notice\/2738\/revisions\/2754"}],"wp:attachment":[{"href":"https:\/\/www.brandonu.ca\/safety\/wp-json\/wp\/v2\/media?parent=2738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}